A Simple Key For site acceptance test checklist Unveiled
Initiate the boot-up system for engineering and operator workstations as per the producer’s Recommendations.Following the site continues to be cleaned and all fixtures are put in, an internal box strain and ventilation check is done. This test is performed to make certain that the Area is effectively pressurized and There exists enough air flow.I